全自动搅拌车工作中应该注意的事项

作者:http://www.zkzsljbc.com 时间:2022-09-17

全自动搅拌车是建筑行业必不可少的使用机械,水泥砂石的搅拌都需要他,全自动搅拌车有好多种类,如全自动搅拌车、移动式全自动搅拌车等,那么它们工作时有什么注意事项?
Full automatic mixer is an indispensable machine in the construction industry. It is required to mix cement sand and gravel. There are many types of full automatic mixer, such as full automatic mixer, mobile full automatic mixer, etc. What are the precautions when they work?
一、全自动搅拌车启动后,应使搅拌筒达到正常转速后进行上料,上料后要及时加水。添加新料须先将搅拌机内原有的混凝土全部卸出后才能进行。不得中途停机或满载荷时起动搅拌机,反转出料者除外。
1、 After the automatic mixer truck is started, the mixing drum shall be fed when it reaches the normal speed, and water shall be added in time after feeding. Add new materials only after all the original concrete in the mixer is discharged. It is not allowed to stop the mixer midway or start the mixer when it is fully loaded, except for reverse discharging.
全自动搅拌车使用过程中切勿使砂石落入机器运转部分中去,以免使运转部件卡住损坏。料斗提升后,斗下不能有人通过或停留,以免制动器失灵发生意外事故。斗下检修或进行清理工作时,强行停机并将上料斗用保险链条拉牢。
During the use of the automatic mixer, do not let the sand and gravel fall into the running part of the machine, so as to prevent the running parts from being stuck and damaged. After the hopper is lifted, no one can pass or stay under the hopper to avoid accidents due to brake failure. When overhauling or cleaning under the hopper, stop the hopper by force and fasten the upper hopper with a safety chain.
二、全自动搅拌车完成作业后应对搅拌机进行清洗,操作人员如需要进入筒内清洗时,须切断电源,设专人在外监护,或卸去熔断器并锁好电闸箱,然后方可进入。
2、 After the completion of the operation of the fully automatic mixer, the mixer shall be cleaned. If the operator needs to enter the cylinder for cleaning, he/she must cut off the power supply, assign a special person to monitor outside, or remove the fuse and lock the switch box before entering.
全自动搅拌车
全自动搅拌车上料斗的摇把,应用销子固定,以免人进入简内清理时,身体碰触摇把使料斗提升,发生挤压事故。全自动搅拌车在工作中若发现故障不能继续运转时,应立即切断电源,将搅拌筒内的混凝土干净,然后进行检修。
The handle of the hopper on the fully automatic mixer shall be fixed with a pin to prevent the hopper from being lifted by touching the handle when people enter the cylinder for cleaning. If the automatic mixer cannot continue to operate in case of any fault during operation, the power supply shall be cut off immediately, the concrete in the mixing drum shall be cleaned, and then maintenance shall be carried out.
三、行驶过程中,加长溜槽一定要放在卸料溜槽的支架上。之所以一定要将加长溜槽放在支架的位置,是因为放在那里能将它更好固定住。如果固定不严谨的话,很有可能会在行驶中,对其他车辆或者路人造成伤害。所以为了保障自己和他人,将其放在卸料溜槽的支架上。
3、 During driving, the extended chute must be placed on the support of the discharge chute. The reason why the extended chute must be placed on the support is that it can be better fixed there. If the fixing is not strict, it is likely to cause damage to other vehicles or passers-by during driving. Therefore, in order to ensure their own safety and the safety of others, they are placed on the support of the discharge chute.
全自动搅拌车工作中应该注意的事项有哪些呢?在此讲解了三方面的内容,您有什么不了解的地方或者有怎样的需求,随时来我们网站http://www.zkzsljbc.com进行咨询!
What should be paid attention to in the work of automatic mixer? Three aspects are explained here. If you don't know anything or have any needs, please come to our website at any time http://www.zkzsljbc.com Consult!